Total Energy Needed (Wh) | Total Energy on site (Wh) | ||
---|---|---|---|
Mission Days: |
Passive Generation Daily: |
||
Team Size: |
Active Generation Daily: |
||
MBITR Amount: |
Total Generation: |
||
ASIP Amount: |
Battery Energy Carried: |
||
Total Energy Needed: |
Total Energy On Site: |
Results (Wh & lb) | |||
---|---|---|---|
Energy Needed/Left: |
Total Weight: |
Mission Days: |
|
Team Size: |
|
MBITR Amount: |
|
ASIP Amount: |
|
Method | Units | Minutes/Day |
---|---|---|
Hand Crank | ||
Boots | ||
Knee Device | ||
Combustion | ||
Solar | ||
Turbine |
Types | Amount |
---|---|
BA-2590(NCA) |
|
PRC-148(NCA) |